home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V13_1 / V13_160.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  18KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from hogtown.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/QbjBr6C00WBwI6Uk4d>;
  5.           Sat, 16 Feb 91 02:22:46 -0500 (EST)
  6. Message-ID: <wbjBr1a00WBw86T05S@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Sat, 16 Feb 91 02:22:42 -0500 (EST)
  12. Subject: SPACE Digest V13 #160
  13.  
  14. SPACE Digest                                     Volume 13 : Issue 160
  15.  
  16. Today's Topics:
  17.         Re: Confusion regarding "Firm Fred Decisions"
  18.             Re: Ulysses Update - 02/12/91
  19.             Re: Magellan Update - 02/14/91
  20.        Looking for a good job in digital tevevision R&D
  21.                    UOSAT 2
  22.         Re: "Magnum" Electronic Intelligence Satellite
  23.            Augustine's Space Program Report
  24. Mobile Launch Complex (MLC) (was Re: List of Frequently-Seen Acronyms)
  25.               NASA Tech Briefs overseas
  26.                Re: ET Use  (Was:<None>)
  27.  
  28. Administrivia:
  29.  
  30.     Submissions to the SPACE Digest/sci.space should be mailed to
  31.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription requests,
  32.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  33.              tm2b+@andrew.cmu.edu
  34.  
  35. ----------------------------------------------------------------------
  36.  
  37. Return-path: <space-request+@andrew.cmu.edu>
  38. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  39. Date: 7 Feb 91 13:37:39 GMT
  40. From: rex!wuarchive!zaphod.mps.ohio-state.edu!caen!engine.engin.umich.edu!sheppard@ames.arc.nasa.gov  (Ken Sheppardson)
  41. Organization: University of Michigan Engineering, Ann Arbor
  42. Subject: Re: Confusion regarding "Firm Fred Decisions"
  43. References: <1991Feb5.203323.14738@eagle.lerc.nasa.gov>
  44. Sender: space-request@andrew.cmu.edu
  45. To: space@andrew.cmu.edu
  46.  
  47. In article <1991Feb5.203323.14738@eagle.lerc.nasa.gov> 
  48.      lvron@earth.lerc.nasa.gov writes:
  49.  
  50. >Any confusion resulting from the posting "Firm Fred Decisions" I will take
  51. >the blame for.  It turns out that I had correct information, but not 
  52. >comprehensive information.  
  53.  
  54.    Let me just point out that the orinal list included...
  55.  
  56.      "o the budget is now for man-tended capability (MTC) only"
  57.  
  58.      "o a lab module will exist only at MTC"
  59.  
  60.      "o there will be no habitation module or nodes"
  61.  
  62.      "o no [PMC] equipment or growth planned"
  63.  
  64. >Here is the skinny:
  65. >
  66. >o  The SSF program is being divided into three stand-alone phases, for 
  67. >   budget purposes: man-tended capability (MTC), permanently-manned 
  68. >   capability (PMC), and EMCC, whatever that stands for.  The term "stand-
  69. >   alone" I think means that each phase will be funded separately, with
  70. >   the results of the first being used to determine whether/for how much
  71. >   the subsequent phases will be funded, etc.
  72.  
  73.    Hopefully this bullet will clear up any confusion resulting from
  74.    the original list. There are, in fact, plans to go beyond MTC;there
  75.    will, in fact, be additional lab space beyond MTC;there will be hab
  76.    space and nodes;PMC is still part of the program.
  77.  
  78.    [ EMCC - Eight-Man Crew Capability ]
  79.  
  80. >o  Solar Dynamic and FTS have been stopped, as I stated before.
  81.  
  82.    I don't believe Solar Dynamic was part of the baseline (post-ISPDR) 
  83.    program to begin with, was it ? We've [almost] always used it in growth 
  84.    configurations beyond the baseline AC 75 kW, but since growth beyond 
  85.    AC hasn't been a requirement (for the last few years) was SD beyond
  86.    the 'technology development' phase ?
  87.  
  88.    Is the $10M for solar dynamic power research set aside in the '91
  89.    budget [Source: VA/HUD/IA House-Senate Conference Report HR101-900]
  90.    an increase or decrease from '90 funding ?
  91.  
  92.    Of course the same report lists $106.3M for FTS, so those numberse 
  93.    could be out-the-window by now.
  94.  
  95. >o  The 18.75 kW power capability at MTC I mentioned previously is a number
  96. >   recommended for five years after beginning-of-life (BOL).  At BOL, they
  97. >   think 37.5 kW will be achieved.
  98.  
  99.    Is this a change from baseline ? Hasn't BOL power always been greater
  100.    than the 18.75/37.5/75 kW available at MTC/PMC/AC respectively ? Do you
  101.    have before/after Restructuring number to compare with?
  102.  
  103.    ('available' => power available at DDCU [DC/DC Conversion Unit ?] output,
  104.     right ?. Actual power off the PVs is significantly greater, isn't it ? 
  105.     Do you happen to have the overall efficiency number ? BTW, do you happen 
  106.     to know how much the PVs were widened/lengthened as a result of Turbo ?)
  107.  
  108. >o  The truss is to be pre-integrated (PIT), saving mucho EVA during assembly.
  109.  
  110.    Just to avoid confusion, PIT -> Pre-Integrated Truss.
  111.  
  112.    Another language change: The 'Transverse Boom' shall from this date
  113.    forward be refered to as the 'Transverse BEAM'. [Source: presentations
  114.    given by Bensimon and Moorehead to Lenoir in late January]
  115.  
  116. >o  Some component and acceptance testing in the Electrical Power System (EPS)
  117. >   is to be deleted.  If anybody cares, I'll get back to you on that.
  118. >
  119. >o  In the six-year period from fiscal 1991-96, a program cost reduction of
  120. >   ~$6 billion is anticipated.
  121. >
  122. >Posted with minimal comment by RG
  123.  
  124.   Unsolicited comments added by:
  125.  
  126. --
  127. ===============================================================================
  128.  Ken Sheppardson                                  Email: kcs@sso.larc.nasa.gov
  129.  Space Station Freedom Advanced Programs Office   Phone: (804) 864-7544
  130.  NASA Langley Research Center, Hampton VA         FAX:   (804) 864-1975
  131. ===============================================================================
  132.  
  133. ------------------------------
  134.  
  135. Return-path: <space-request+@andrew.cmu.edu>
  136. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  137. Date: 14 Feb 91 18:33:25 GMT
  138. From: usc!elroy.jpl.nasa.gov!swrinde!zaphod.mps.ohio-state.edu!pacific.mps.ohio-state.edu!linac!convex!news@ucsd.edu  (Dave Dodson)
  139. Organization: Convex Computer Corporation; Richardson, TX
  140. Subject: Re: Ulysses Update - 02/12/91
  141. References: <1991Feb13.000036.10785@jato.jpl.nasa.gov>, <1991Feb14.060346.12296@cimage.com>
  142. Sender: space-request@andrew.cmu.edu
  143. To: space@andrew.cmu.edu
  144.  
  145. In article <1991Feb14.060346.12296@cimage.com> gregc@dgsi.UUCP (Greg Cronau/10000) writes:
  146. >In article <1991Feb13.000036.10785@jato.jpl.nasa.gov> baalke@mars.jpl.nasa.gov (Ron Baalke) writes:
  147. >>Following the declaration a
  148. >>suggestion was received from a JPL telecommunications expert that it may be
  149. >>necessary to apply a Doppler correction to the command sub-carrier uplink
  150.                                                          ^^^^^^^^^^^
  151. >>frequency due to the current velocity of the spacecraft relative to the Earth
  152. >
  153. >Are you really transmitting commands to the spacecraft at that *low* of a
  154. >frequency? 16000Hz? Are you sure that isn't 16000 Mhz? Just curious.
  155.  
  156. Note that the 16000Hz is the sub-carrier frequency.  According to standard
  157. usage of the term sub-carrier, the radio signal is at a high frequency, and
  158. is modulated with the sub-carrier.
  159.  
  160. ----------------------------------------------------------------------
  161.  
  162. Dave Dodson                                     dodson@convex.COM
  163. Convex Computer Corporation      Richardson, Texas      (214) 497-4234
  164.  
  165. ------------------------------
  166.  
  167. Return-path: <space-request+@andrew.cmu.edu>
  168. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  169. Date: 14 Feb 91 20:37:31 GMT
  170. From: elroy.jpl.nasa.gov!jato!mars!baalke@decwrl.dec.com  (Ron Baalke)
  171. Organization: Jet Propulsion Laboratory, Pasadena, CA.
  172. Subject: Re: Magellan Update - 02/14/91
  173. References: <1991Feb14.175840.6140@jato.jpl.nasa.gov>, <1991Feb14.185311.29308@porthos.cc.bellcore.com>
  174. Sender: space-request@andrew.cmu.edu
  175. To: space@andrew.cmu.edu
  176.  
  177. In article <1991Feb14.185311.29308@porthos.cc.bellcore.com> rdm2@chaucer.UUCP (25362-roe mcburnett) writes:
  178. >In article <1991Feb14.175840.6140@jato.jpl.nasa.gov>
  179. > baalke@mars.jpl.nasa.gov (Ron Baalke) writes:
  180. >>
  181. >> MAGELLAN STATUS REPORT February 14, 1991
  182. >[...]
  183. >>     The strategy of shortening the mapping pass by ten minutes cuts 26
  184. >>degrees of latitude off the southern end of the delayed image swaths.  Over
  185. >>the 17 to 21 days that this this strategy will be used for temperature control,
  186. >>the loss of image area will be less than 1% of the Venus surface.
  187. >
  188. >Ron,
  189. >
  190. >Will the orbiter be able to scan this area of the surface later on in
  191. >the mission??  Or are we going to be missing some of the surface forever?
  192. >
  193.  
  194. In the extended mission, Magellan will go back over the planet again and
  195. pick up any areas it missed on the first go around.  Venus rotates underneath
  196. the spacecraft every 243 days.
  197.  
  198.       ___    _____     ___
  199.      /_ /|  /____/ \  /_ /|      Ron Baalke         | baalke@mars.jpl.nasa.gov
  200.      | | | |  __ \ /| | | |      Jet Propulsion Lab | Is it mind over matter,
  201.   ___| | | | |__) |/  | | |___   M/S 301-355        | or matter over mind?
  202.  /___| | | |  ___/    | |/__ /|  Pasadena, CA 91109 | Never mind.
  203.  |_____|/  |_|/       |_____|/                      | It doesn't matter.
  204.  
  205. ------------------------------
  206.  
  207. Return-path: <space-request+@andrew.cmu.edu>
  208. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  209. Date: 10 Feb 91 21:01:15 GMT
  210. From: sdd.hp.com!zaphod.mps.ohio-state.edu!think.com!linus!philabs!briar!rfc@ucsd.edu  (Robert Casey)
  211. Subject: Looking for a good job in digital tevevision R&D
  212. Sender: space-request@andrew.cmu.edu
  213. To: space@andrew.cmu.edu
  214.  
  215. Hi.  Just a quick note that I am looking for a good job in the digital TV
  216. area.
  217. Find my resume in   misc.jobs.resumes
  218.  
  219. I got caught in Philips' reduction in force.  Philips is in bad fincinal
  220. shape.  
  221.  
  222. Anyway, call me at 201-261-4066.  Point any and all headhunters my way. 
  223. don't try to e-mail, as my account may be deleted soon.  Suprised that it
  224. still exists. 
  225.  
  226. Thanks
  227.  
  228. ------------------------------
  229.  
  230. Return-path: <space-request+@andrew.cmu.edu>
  231. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  232. Date: 11 Feb 91 16:04:06 GMT
  233. From: mcsun!ukc!mucs!liv-cs!liv!eeet176@uunet.uu.net  (Andrew Hartridge)
  234. Organization: University of Liverpool
  235. Subject: UOSAT 2
  236. Sender: space-request@andrew.cmu.edu
  237. To: space@andrew.cmu.edu
  238.  
  239. Can anyone tell me the frequency that UOSAT 2 transmits on ??
  240. Also does UOSAT 1 still exist or did that decay ages ago ??
  241.  
  242.                         Thanks in Advance
  243. Andrew Hartridge
  244. ------------------------------------------------------------------------
  245. | Dept. Electrical Eng.     /     UUCP: !mcvax!ukc!uk.ac.liv!eeet176  /
  246. | University of Liverpool, /    LOCAL: eeet176 @ uxa                 /
  247. | Brownlow Hill,          /    JANET: eeet176 @ uk.ac.liverpool.ibm /
  248. | Liverpool,             /           andrewh @ uk.ac.nsfnet-relay  /
  249. | ENGLAND.              / INTERNET: andrewh @ mole.ai.mit.edu     /
  250. |                      /           an808   @ cwns16.ins.cwru.edu /
  251. -----------------------------------------------------------------
  252.  
  253. ------------------------------
  254.  
  255. Return-path: <space-request+@andrew.cmu.edu>
  256. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  257. Date: 5 Feb 91 16:24:19 GMT
  258. From: att!linac!uwm.edu!cs.utexas.edu!news-server.csri.toronto.edu!utzoo!henry@ucbvax.Berkeley.EDU  (Henry Spencer)
  259. Organization: U of Toronto Zoology
  260. Subject: Re: "Magnum" Electronic Intelligence Satellite
  261. References: <15325@celit.fps.com>
  262. Sender: space-request@andrew.cmu.edu
  263. To: space@andrew.cmu.edu
  264.  
  265. In article <15325@celit.fps.com> dave@fps.com (Dave Smith) writes:
  266. >I saw a mention in Time of a satellite named "Magnum" which is supposed to
  267. >be used for electronic eavesdropping.  The blurb said that it had an
  268. >antenna "the size of a baseball field."  This sounds like a really large
  269. >structure to be deploying automatically.  Does anyone have any info
  270. >on this beasty?
  271.  
  272. What you've just said -- it's called "Magnum", it's an eavesdropping
  273. satellite, and it probably has a big deployable antenna -- is just about
  274. the sum total of unclassified knowledge about it.
  275. -- 
  276. "Maybe we should tell the truth?"      | Henry Spencer at U of Toronto Zoology
  277. "Surely we aren't that desperate yet." |  henry@zoo.toronto.edu   utzoo!henry
  278.  
  279. ------------------------------
  280.  
  281. Return-path: <space-request+@andrew.cmu.edu>
  282. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  283. Date: 13 Feb 91 14:45:57 GMT
  284. From: o.gp.cs.cmu.edu!fs7.ece.cmu.edu!sei!mjg@PT.CS.CMU.EDU  (Michael Gagliardi)
  285. Organization: Software Engineering Institute, Pittsburgh, PA
  286. Subject: Augustine's Space Program Report
  287. Sender: space-request@andrew.cmu.edu
  288. To: space@andrew.cmu.edu
  289.  
  290.  
  291.     Does anyone know how to obtain a copy of "Summary and Principal
  292.     Recommendations of the Advisory Committee on the Future of the U.S.
  293.     Space Program"?
  294.  
  295.   Thanks,
  296.     Mike
  297.  
  298. ------------------------------
  299.  
  300. Return-path: <space-request+@andrew.cmu.edu>
  301. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  302. Date: 14 Feb 91 02:11:46 GMT
  303. From: mintaka!ogicse!uwm.edu!caen!blue.engin.umich.edu!sheppard@bloom-beacon.mit.edu  (Ken Sheppardson)
  304. Organization: University of Michigan Engineering, Ann Arbor
  305. Subject: Mobile Launch Complex (MLC) (was Re: List of Frequently-Seen Acronyms)
  306. References: <mark.666405606@typhoon.ucar.edu>, <190@miccal.CAMPBELL.CA.US>
  307. Sender: space-request@andrew.cmu.edu
  308. To: space@andrew.cmu.edu
  309.  
  310. In <190@miccal.CAMPBELL.CA.US> mfoster@nova.UUCP (Michael Foster):
  311. >In <mark.666405606@typhoon.ucar.edu> bradfrd2@ncar.ucar.edu (Mark Bradford):
  312. >>
  313. >>SIRTF: Space InfraRed Telescope Facility
  314. >>SME: Solar Mesosphere Explorer
  315. >
  316. >You forgot:
  317. >
  318. >SLC: Space Launch Complex
  319. >
  320. >As you included VAFB (Vandenberg Air Force Base), I figured you wouldn't
  321. >forget the famous (infamous?) SLC-6 (pronounced Slick-Six), the west coast
  322. >Shuttle launch complex now in Mothballs. 
  323.  
  324.    Mothballs ? I thought it was just outside Lompoc, just north of Santa
  325.    Barbara. Did they just move the entire base or just the SLC ?
  326.  
  327.    And where exactly is Mothballs ?
  328.  
  329. ------------------------------------------------------------------------------
  330.    Quote of the Week: 
  331.  
  332.                "Where are your troops and can I go count them ?"
  333.  
  334.                                      - Iraqi Reporter during Pentagon
  335.                                        Briefing skit, SNL, 2/9/91
  336. --
  337. ===============================================================================
  338.  Ken Sheppardson                                  Email: kcs@sso.larc.nasa.gov
  339.  Space Station Freedom Advanced Programs Office   Phone: (804) 864-7544
  340.  NASA Langley Research Center, Hampton VA         FAX:   (804) 864-1975
  341. ===============================================================================
  342.  
  343. ------------------------------
  344.  
  345. Return-path: <space-request+@andrew.cmu.edu>
  346. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  347. Date: 7 Feb 91 03:12:25 GMT
  348. From: milton!sumax!amc-gw!thebes!polari!crad@beaver.cs.washington.edu  (Charles Radley)
  349. Organization: Seattle Online Public Unix (206) 328-4944
  350. Subject: NASA Tech Briefs overseas
  351. Sender: space-request@andrew.cmu.edu
  352. To: space@andrew.cmu.edu
  353.  
  354.  
  355. I have received a package from NASA which says Tech Briefs is
  356. Now available  for the first time outside the United States... 
  357. Subscription is  $ 150 US for one year ( $ 188 for 2 years ).  One
  358. year  rates in non-US currency are:  $ 180 Australian, 18000
  359. Austrian  Schillings, 85 pounds sterling, $ 175 Canadian, 950 Danish
  360. Kroener, 800  French francs, $ 1200 Hong kong, 90 Irish punts, 22000
  361. Japanese Yen, 275  Dutch Guilders, 250 New Zealand dollars (?), 925
  362. Norwegian Kroener, 900  Swedish Kroener, 200 Swiss Francs, 250 German
  363. deutschemarks, 5000 Belgian  francs, $ 300 Singapore.  Monthly
  364. issues, includes air mail postage.    Or failing that, you can pay by
  365. Visa Card, Mastercard or American Express,  provide card number abd
  366. exipration date, name and signature. (you wll  probably be billed in
  367. US $ at the prevaling exchange rate ).  And if you do  not like it
  368. you can terminate the subscription at any time and receive a  refund
  369. of the unused balance.    Checks payable to   NASA Tech Briefs.  Mail
  370. to NASA Tech Briefs, 41 East  42 nd Street - Suite 921,   New York,
  371. NY 10017-5391, USA.
  372.    telephone +-1-212-490-3999 , fax = +-1-212-986-7864.
  373. Remember to include your mailing address to which the magazine is 
  374. to be sent
  375.  
  376. ------------------------------
  377.  
  378. Return-path: <space-request+@andrew.cmu.edu>
  379. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  380. Date: 14 Feb 91 15:46:10 GMT
  381. From: usc!zaphod.mps.ohio-state.edu!ub!ubvmsb.cc.buffalo.edu!v071pzp4@ucsd.edu  (Craig L Cole)
  382. Organization: University at Buffalo
  383. Subject: Re: ET Use  (Was:<None>)
  384. References: <1991Feb8.163830.7956@dbase.A-T.COM>, <9068@hub.ucsb.edu>, <1991Feb14.024029.14015@engin.umich.edu>
  385. Sender: space-request@andrew.cmu.edu
  386. To: space@andrew.cmu.edu
  387.  
  388. In article <1991Feb14.024029.14015@engin.umich.edu>, sheppard@caen.engin.umich.edu (Ken  Sheppardson) writes...
  389. >In <9068@hub.ucsb.edu> 3001crad@ucsbuxa.ucsb.edu (Charles Frank Radley):
  390. >>
  391. >>     The External Tank idea is seriously oversold...
  392. >    I've heard several folks involved with shuttle explain that one
  393. >    of the most serious problems associated with ET retrofitting is
  394. >    a result of the basic nature of the tank: it's a large cryogenic
  395. >    tank, covered with insulation. The insulation is what gives the tank
  396. >    it's orange color. Normally the ET is dropped early enough that it
  397. >    quickly drops out of orbit. If it were carried higher and left to
  398. >    become part of a station, insulation flaking off the ET could
  399. >    cause serious orbital debris problems.
  400.  
  401. Just my $0.02:
  402.  
  403. What do you do with a room when you can't keep the paint from
  404. cracking and peeling? 
  405.  
  406. You wallpaper it.
  407.  
  408. Can the ET be "wallpapered" with something, to keep it from flaking?
  409. Some EVA'ing astronauts could do it after they're in orbit.
  410.  
  411. Maybe some kind of foil for reflection of heat or something...
  412.  
  413. No flames, just an idea.
  414.  
  415. Craig Cole
  416. V071PZP4@UBVMS.CC.BUFFALO.EDU
  417. V071PZP4@UBVMS.BITNET
  418.  
  419. ------------------------------
  420.  
  421. End of SPACE Digest V13 #160
  422. *******************
  423.